![Schweitzer Engineering Laboratories SEL-421-4 Instruction Manual Download Page 156](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_1216726156.webp)
4.28
SEL-421 Relay
Instruction Manual
Date Code 20171021
Front-Panel Operations
One-Line Diagrams
Double-Bus Double Breaker
Figure 4.33
Left Breaker Bay With Ground Switch (Option 19)
Figure 4.34
Left Breaker Bay Without Ground Switch (Option 20)
BAYNAME
BUSNAM1
AQ_1
AQ_2
AQ_3
AQ_4
AQ_5
AQ_6
ESC
NAVIG
BUSNAM2
SW3
SW2
BK1
BK2
SW1
SW4
BAYNAME
BUSNAM1
AQ_1
AQ_2
AQ_3
AQ_4
AQ_5
AQ_6
ESC
NAVIG
BUSNAM2
SW3
SW2
BK1
BK2
SW1
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...