![Schweitzer Engineering Laboratories SEL-421-4 Instruction Manual Download Page 1139](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_12167261139.webp)
11.11
Date Code 20171006
Instruction Manual
SEL-400 Series Relays
Time and Date Management
Time-Synchronized Events
Step 6. Select settings.
a. Click the
+
mark next to
Relay Configuration
.
b. Click the
Trip Logic
and
ER Trigger
branch.
You will see the
Trip Logic
and
ER Trigger Settings
dialog box.
Step 7. Click in the
ER Event Report Trigger Equation
(SEL
OGIC
) text
box and add
OR R_TRIG PSV02
to the end of elements already in
this SEL
OGIC
control equation.
Step 8. Click
File > Save
to save the new settings in QuickSet.
NOTE:
You should be careful to
remove this event report trigger once
you have completed your testing.
Otherwise, the relay will continue to
trigger new events every day at the
programmed time.
Step 9. Upload the new settings to the relay:
a. Click
File > Send
.
QuickSet prompts you for the settings class or instance you want
to send to the relay.
b. Click the check box for
Group 1
(or the settings group that you
are programming).
c. Click
OK
.
If you see no error message, the new settings are loaded in the relay.
COMTRADE File Information
Retrieve the COMTRADE files for the time-triggered data captures from each
relay with the
FILE READ
command.
Parse the binary COMTRADE data for the power system currents and voltages
you need to calculate system quantities.
Fault Analysis
Use the relay measurement and communications capabilities to obtain precise
simultaneous measurements from the power system at different locations. Com-
bining system measurements from a number of key substations gives you a snap-
shot picture of the phasor relationships in the power system at a particular time.
You can perform extensive fault analysis by evaluating the simultaneous mea-
surements gathered at a central computer or data server.
Install at least two relays in the power system to implement dynamic phasor
determination.
shows an example of a 230 kV overhead transmission
line with a relay at each terminal. Connect GPS clocks (such as the SEL-2407) at
each substation to provide high-accuracy time-signal inputs for each relay.
With synchronized and time-stamped binary COMTRADE data, you can develop
automated computer algorithms for comparing these data from different locations
in the power system.
Figure 11.6
230 kV Transmission Line System
Relay
Relay
Z1L, Z0L
Z1S, Z0S
BK1
GPS Rx
S (Harvard)
R (Princeton)
BK2
Z1R, Z0R
GPS Rx
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...