5.158
SEL-421 Relay
Instruction Manual
Date Code 20171021
Protection Functions
Synchronism Check
Synchronism Check
NOTE:
If the relay is using a remote
data acquisition system, such as TiDL,
the operating times will be delayed by
1.5 ms. Use caution when setting the
relay for synchronism check to
account for this added delay.
Synchronism-check elements prevent circuit breakers from closing if the corre-
sponding phases across the open circuit breaker are excessively out of phase. The
synchronism-check elements selectively close circuit breaker poles under the fol-
lowing criteria:
The systems on both sides of the open circuit breaker are in phase (within a
settable voltage angle difference), and one of the following is true:
➤
The voltages on both sides of the open circuit breaker are healthy
(within a settable voltage magnitude window).
➤
The difference between the voltages on both sides of the open circuit
breaker are less than a set limit.
➤
The voltages on both sides are healthy and the difference voltage is
less than a set limit.
You can use synchronism-check elements to program the relay to supervise cir-
cuit breaker closing; include the synchronism-check element outputs in the close
SEL
OGIC
control equations. These element outputs are Relay Word bits
25W1BK1, 25A1BK1, 25W2BK1, 25A2BK1, 25W1BK2, 25A1BK2,
25W2BK2, and 25A2BK2 (see
Synchronism-Check Logic Outputs on page 5.160
and
Angle Checks and Synchronism-Check Element Outputs on page 5.168
An example best demonstrates the synchronism-check capability in the relay.
This subsection presents a typical synchronism-check system.
Generalized System
The generalized system single-line drawing in
shows a partial cir-
cuit breaker-and-a-half or ring-bus substation arrangement. Presuming that both
Circuit Breakers BK1 and BK2 are open, the system is split into three sections:
Bus 1, Bus 2, and Line.
Paralleled and Asynchronous Systems
shows remote sources for each section. Often, a portion of the
power system is paralleled beyond the open Circuit Breakers BK1 and BK2; the
remote sources are really the same aggregate source. If the aggregate source is
much closer to one side of the open circuit breaker than the other, there is a
Figure 5.118
Partial Breaker-and-a-Half or Partial Ring-Bus Breaker
Arrangement
Bus 2
Bus 1
Line
BK1
BK2
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...