
Issue 1.0
March 2001
9-9
365-575-389
Installation Manual
Local Installation Testing
ODU Tests (Continued)
ODU Testing
Procedures
(continued)
Step
Action
Reference
6
Repeat for each successive OCHAN_ OUT.
7
Repeat Steps 1 - 6 for all other line, using appropriate
ODUs and OAs for each line.
8
Return the intrashelf fiber jumpers to their original
positions when complete.
9
When finished testing, enter the
SECURITY.Enter.System command in the CMC to
ENABLE the APSD feature.
!
CAUTION:
APSD must be enabled for safety purposes.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...