Installation Manual
About This Document
How to Use This Manual
Introduction
This manual is divided into several chapters. The chapters are numbered in the
order in which they are to be performed.
This manual is intended ONLY for use in a central office environment in Network
Equipment Building System (NEBS) installations and for installation and testing
performed prior to turnover to central office personnel.
Section
Descriptions
The chapters in this document provide the following information:
(Continued on next page)
Chapter Number and
Title
Description
About This Document
Describes the purpose, intended audience, and
organization of this document. Ordering information and
procedures to comment on this document are included.
Chapter 1, “Overall
Installation and Test
Considerations”
Provides a list of required tools and test equipment for
WaveStar OLS 40G equipment installation and testing,
gives a description of requirements for the Personal
Computer to be used as the CenterLink Management
Console (CMC), presents safety information, and gives
a list of other related documentation. Training, security,
and technical support information is also presented.
Chapter 2, “System
Installation Planning”
Discusses system and network level installation and
testing issues.
Chapter 3, "Equipment
Installation"
Describes how to uncrate and erect WaveStar OLS 40G
equipment bay frames or cabinets. Also covered is the
installation of miscellaneously mounted OLS and OT
shelves.
Chapter 4, "Power
Cable Installation"
Provides information about power cables related to
WaveStar OLS 40G and describes how to install the
power cables.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...