
Issue 1.0
March 2001
5-19
365-575-389
Installation Manual
Wired Cable Installation
Serial, Parallel, and X.25 Telemetry
Cable Installation (Continued)
X.25 (TL-1)
Telemetry Cable
Installation
(continued)
Table 5-10. X.25 Telemetry Cable Connection (continued)
X.25 Telemetry Cable Installation Procedure
Perform the following steps to install X.25 telemetry cable.
NOTE:
WaveStar OLS 40G, Group 602 and 652 Cables have a socket (female-
type connector with a blank label) at one end and a plug (male-type
connector labeled P156A) at the other end. The cable plug end (male)
mates with the socket (J18) on the OLS. The socket end (female) is
intended to mate with the X.25 network equipment. For cables that have
two blank labels, mark P18 on the blank label at the plug (male) end of the
cable.
(Continued on next page)
Name
Designation
P156A
Terminal
Wire
Color
Datakit
End
MSR Receiver Signal
Element Timing
MSRRSET
17
R/G
17 RSET
No Connection
None
18
None
No Connection
None
19
None
MSR Data Terminal
Ready
MSRDTR
MSRCTS
20
5
W/S
W/G
20 DTR
4 RTS
**
No Connection
None
21
None
MSR Ring Indicator
MSRRI
22
R/BL
22 RRI
No Connection
None
23
None
No Connection
None
24
None
No Connection
None
25
None
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...