Powering
Background
Introduction
This chapter describes the procedures to power WaveStar™ OLS 40G Equipment
and to power the Optical Translator equipment.
General
Considerations
Disconnect the office alarms from the WaveStar OLS 40G Network Element
before performing any tests. Reconnect the office alarms upon test completion.
Tools, Test Sets and
Accessories
The following equipment is required to complete the procedures in this section:
n
Analog Ohm Meter for measuring resistance of Battery Return cable.
n
Multimeter capable of measuring resistance (ohms) and DC voltage from
–40 to –60 volts.
n
Wrist strap connected to the wrist strap ground jack of the user panel for
ESD protection.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...