Local Installation Testing
Background
Overview
This section describes the LED test, ODU and OMU Verification tests, and
Installation Auto Turnup tests for the WaveStar
TM
OLS 40G at end terminal, dual
facing terminal, and repeater offices. Tests described in this section must be
performed on each shelf.
It also describes testing of:
n
The Optical Translator (OT)
n
The OTU slots
n
The miscellaneous discretes on each OTU and associated wiring to the
EMDU (for Release 2.1 and earlier)
n
The WaveStar OLS 40G/OT integration
n
The optical output of each OTU/OTPM
n
Tests described in the OT subsection must be performed on each OTU/
OTPM and OT cabinet.
General
Considerations
!
CAUTION:
Installation Auto Turnup tests are performed only out of service. If these
tests are performed in service, service will be interrupted.
!
WARNING:
Unterminated optical connectors may emit laser radiation. Do not view
beam with optical instruments. Avoid direct exposure to beam.
Note the following before starting installation Auto Turnup tests:
n
Disconnect the office alarm cable from the WaveStar OLS 40G shelf and/or
OT before performing any tests. Reconnect the office alarm cable after
completing testing.
n
This procedure requires that the NE has WaveStar OLS 40G software
installed. All circuit packs must be installed, with their FAULT LEDs off,
except the OAs which have flashing LEDs. Software Installation and Circuit
Pack Insertion procedures are in Section 9.d
n
No circuit pack should be pulled or inserted while any of the Auto Turnup
tests are in progress.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...