
Issue 1.0
March 2001
5-67
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
Cable installation for Bays 3-5 continues:
(Continued on next page)
Step
Action
13
Route the P7 end of the ED-7G045-20 G6 cable through the left side of
the OT System Controller Shelf of Bay 4 and attach P7 to the J7 CTL
OUT connector.
14
Route the P6 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 4 and attach P6 to the J6 CTL IN
connector.
15
Route the P9 end of the ED-7G045-20 G7 cable through the left side of
the OT System Controller Shelf of Bay 4 and attach P9 to the J9 EQPG
IN 1 connector.
16
Route the P8 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 4 and attach P8 to the J8 EQPG OUT
connector.
17
Route the P13 end of ED-7G045-20 G9 cable through the left side of the
OT System Controller Shelf of Bay 4 and attach P13 to J13 RESET OUT
1 connector.
18
Route the P16 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 4 and attach P16 to the J16 RESET IN
connector.
19
Remove the ED-7G045-20 Group 2 Termination from the Complimentary
Shelf 1 connector J7 of Bay 4 and plug it into Complementary Shelf 2
connector J7 of Bay 4.
20
Route the P7 end of the ED-7G045-20 G6 cable through the left side of
the OT Complimentary 1 Shelf of Bay 4 and attach P7 to the J7 CTL OUT
connector.
21
Route the P6 end of the same cable through the left side of the OT
Complimentary 2 shelf in Bay 4 and attach P6 to the J6 CTL IN
connector.
22
Route the P10 end of the ED-7G045-20 G8 cable through the right side of
the OT System Controller Shelf of Bay 4 and attach P10 to the J10 EQPG
IN 2 connector.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...