Power Cable Installation
Multiple OT Shelf Configurations
(Continued)
OT Power Cable
Connection
(continued)
(Continued on next page)
Step
Action
4
Identify the battery feed connections at the BDFB or other protection
equipment. They should be labeled BAT A, BAT A RTN, BAT B, and BAT
B RTN.
5
Check that the supplied ED-9C103-22 power feed cables are labeled for
battery A (RED) and battery B (BLUE) use.
6
Splice feeders from the BDFB to the OLS power cables. The red and blue
power leads connect to –48V. The white power leads connect to the
power feed return.
7
Connect equipment ground lead from cabinet or bay to proper ground
connection.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...