Issue 1.0
March 2001
9-3
365-575-389
Installation Manual
Local Installation Testing
Background (Continued)
Tools, Test Sets
and Accessories
The following equipment is required for performing installation tests at end
terminal, dual facing shelf, repeater or OT offices:
Table 9-1.
Local Installation Test Equipment
Equipment
Number Needed
for End Term. or
Dual Face
Number Needed
for Repeater
# for
OT
Wrist Strap connected to wrist
strap ground jack on user panel
1
1
1
Single Mode Optical Fiber Cable
with appropriate connectors on
each end. Recommended length
2-4 feet
2
Multi-mode Optical Fiber Cable
with appropriate connectors on
each end. Recommended length
2-4 feet
2
4
Optical 93AK8573 33dB Test
cables for loopback testing and
power Measurements
2
4
1
Optical Power Meter
1
1
1
PC for use as CMC (CenterLink
Management Console) with CMC
software loaded and straight and
null modem cables
1
1
Optical connector cleaning
accessories (see Appendix C)
1
1
1
OC-48/STM-16 optical signal
source or test set
a
1
OC-3/STM-1 and/or OC-12/STM-4
optical signal source or test set
1
Optical Multi-Wavelength Meter
(optional as required)
1
a. A signal source such as the Lucent Technologies OC-48 Optical Signal Source
(ITE-7089), a Tektronix Test Set ST2400 with option 12, or any other OC-48/
STM-16 source.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...