
Issue 1.0
March 2001
6-81
365-575-389
Installation Manual
WaveStar OLS 40G Fiber and Circuit Pack Installation
One OA/Two OA Dual Facing Shelf
Installation
Description
This configuration is supported by Releases 2.1 and subsequent releases only.
This section covers the installation of a stand-alone Dual Facing Shelf. It is
possible for a second shelf to be installed in the same bay, yet configured
differently. If this is the case, refer to the appropriate subsection for the fibering of
the other shelf.
This section also covers the fiber and label installation for the One OA/Two OA
Dual Facing Shelf Configuration. It has been broken into five procedures:
■
Intrashelf Fiber Jumper Installation
■
Low-Speed Fiber Jumper Installation to SONET/SDH equipment
■
Outside Plant Fiber Jumper Installation to LGX
■
Customer Maintenance Signal Fiber Jumper Installation
■
End Terminal Circuit Pack and Unit Installation
!
CAUTION:
No fiber jumpers shall be connected to the circuit packs or units at this time.
Do not connect the fiber jumpers until instructed to do so.
Circuit Pack Equip
Procedure For
2-Line Shelf
(Continued on next page)
Step
Action
1
Review information in the Fiber Cable Routing: page 6-9 and Circuit Pack
Installation: page 6-10 sections before beginning this procedure.
2
Refer to Figure 6-17 for circuit pack locations.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...