Issue 1.0
March 2001
7-15
365-575-389
Installation Manual
Powering
Verify A & B Feeds (Continued)
Verify B Feed
(continued)
Step
Action
Reference
6
Remove the 10-amp fuse located in the fuse panel of
Bay 2 or Bay 4, for the A power feed of the top shelf.
Requirement: The PWR ON LED for all shelves should
remain illuminated.
7
Remove the A fuse from the upper shelf fuse panel.
Requirement: Verify that the PWR ON LED is still on for
the upper shelf.
NOTE:
If the LED is not on, then the A and B power
feeders have been swapped. The shelf should still
have power from battery B. Correct the error as
needed and re-test.
8
Reinsert the A fuses into the fuse panel for all shelves.
9
Turn the breaker on or replace the fuse for the A power
feed at the BDFB.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...