
1-2
Issue 1.0
March 2001
365-575-389
Installation Manual
Overall Installation and Test Considerations
Background
Introduction
The purpose of this chapter is to provide the information needed to plan the
installation of a WaveStar™ OLS 40G System.
This chapter presents a list of required tools and test equipment for installation of
WaveStar OLS 40G cabinets or shelves and OT cabinet or shelves, requirements
of the Personal Computer to be used as a CenterLink Management Console,
safety instructions including lightwave safety and ESD considerations, lists of
WaveStar OLS 40G documents and drawings, a list of documents for related
Lucent Technologies equipment, information on training available, system security
features, and Technical Support functions.
Information generic to both products is covered first, followed by a section specific
to each product.
Objectives
This chapter provides information to perform the following:
1.
Overall installation job planning
2.
Identify required tools and test equipement
3.
List safety instructions
4.
Identify documents and drawings
5.
Identify available training classes
6.
Identify technical support functions
Releated
Information
For related information, see the WaveStar OLS 40G Application, Planning, and
Ordering Guide (APOG), 365-575-340.
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...