
Issue 1.0
March 2001
3-25
365-575-389
Installation Manual
Equipment Installation
Cabinet Installation (Continued)
Erecting and
Mounting the
Cabinet
(continued)
Install Cable Rack Top
When a cable rack top assembly is required, assemble per the following:
NOTE:
Information on ordering and installation of cable racks is included on
ED-5D742-10 and ED-5D742-70 for the 5ESS-2000 system.
(Continued on next page)
Step
Action
1
Verify the cabinet is not grounded.
2
Connect the ED-5D742-70, G2 and G10 cable rack to the cabinet using
the four supplied bolts as shown in Figure 3-3, “Cable Rack Top
Installation.”
Summary of Contents for WaveStar OLS 40G
Page 4: ......
Page 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Page 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Page 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Page 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Page 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Page 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Page 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Page 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Page 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Page 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...