
Putting into Operation
NRP2
21
User Manual 1173.9140.02 ─ 07
Some tests respond with further information, messages or actions:
●
If any interface error occurred, the boot process stops after completion of all tests.
It may be continued by pressing the ESC hardkey.
●
During the test of the network connection, additional information is provided, as
described above.
●
If an error is detected when the non-volatile memory containing instrument settings
is checked, an error message is displayed when booting is completed.
The non-volatile memory is then re-initialized completely and the R&S
NRP2 goes
into the preset state. All instrument settings that have been saved are lost as a
result of this procedure.
1.8.3 Shutting down the meter
Whenever the meter is switched off, its settings are saved. The next time it is switched
on, these settings are automatically restored.
► Press the ON/STANDBY key to save the current setup, shut down the operating
system and set the instrument to standby state.
Fig. 1-11: ON / Standby key
Switching off the AC power
You can leave the AC power on permanently to preserve your last instrument settings.
Switching off is required only if the instrument must be completely disconnected from
all power supplies.
Starting the R&S
NRP2
北京海洋兴业科技股份有限公司(证券代码:839145)
电话:010-62176775
网址:www.hyxyyq.com