
Putting into Operation
NRP2
8
User Manual 1173.9140.02 ─ 07
1.2 EMC
EMI impact on measurement results
To prevent EMI, the meter must always be installed to meet the relevant EMC stand-
ards. Never operate the instrument with its enclosure removed. Only use shielded sig-
nal and control cables that meet the relevant EMC standards.
1.3 Unpacking the meter
When you have removed the meter from its packing, check that nothing is missing
using the delivery note and the accessory lists.
If there is any damage, contact the carrier. Keep all the packing to support any claims
for compensation.
Retain the original packing material. If the instrument needs to be transported or ship-
ped at a later date, you can use the material to prevent control elements and connec-
tors from being damaged.
1.4 Setting up the meter
The R&S
NRP2 is designed for use under laboratory conditions, either on a bench top
or in a rack.
1.4.1 Carrying handle
If the R&S
NRP2 is not installed in a rack, it should be set up so that the viewing angle
for the display is optimal. The carrying handle can be locked in a variety of positions to
act as a stand.
To adjust the handle, pull the two side-pieces of the handle outwards so that the han-
dle can be rotated.
The handle locks at angles which are multiples of 60°.
EMC
北京海洋兴业科技股份有限公司(证券代码:839145)
电话:010-62176775
网址:www.hyxyyq.com