Putting into Operation
NRP2
7
User Manual 1173.9140.02 ─ 07
1 Putting into Operation
This section describes the basic steps to be taken when setting up the R&S
NRP2 for
the first time.
It contains the following topics:
●
unpacking
●
AC supply connection
●
switching the meter on and off
●
function testing and installing the meter
●
preset or default settings
●
front and rear views
1.1 Notes on putting into operation
Risk of instrument damage
Note that the general safety instructions also contain information on operating condi-
tions that will prevent damage to the instrument. The instrument's data sheet may con-
tain additional operating conditions.
Risk of instrument damage
Before putting the R&S
NRP2 into operation, make sure that:
●
the sensor inputs are not overloaded
●
the meter’s outputs are not overloaded or wrongly connected
●
the ventilation holes are not obstructed
The meter may be damaged if these precautions are not observed.
Notes on putting into operation
北京海洋兴业科技股份有限公司(证券代码:839145)
电话:010-62176775
网址:www.hyxyyq.com