Field
Option
Description
Cross-line
Display only
Measured position left/right offset based on
the line from the current preplot point to the
given azimuth direction. Negative value is
left.
Radius
Display only
Horizontal distance from the measured posi-
tion to the current preplot point.
Slope to
point
Selectable list Point stored in the working job for which the
slope distance from the current measured
position is required. Useful when offsetting a
preplot point to validate cable length from
previous staked point.
Slope dis-
tance
Display only
Slope distance from measured position to
selected
Slope to point
.
918
Seismic Stakeout