5.
to return to
Stake Slope
. Stake out the next catch point from this
panel.
The closer the real catch point and the approximated stakeout catch point are,
the closer the projected catch point gets to the real catch point.
45.3
Staking/Checking the Road
45.3.1
The Stake/Check Panel
The
Stake Line
is shown as example.
Only lines from the selected layer are displayed.
Colour coding
Working job data is displayed in grey. Design job data is displayed in full colour.
Selected line
Colour
Working line
Orange
Centreline
Green
Selected line
Thick black
Key
Description
Measure
For GS:
To start measuring the point being staked. The key changes
to
Stop
.
For TS:
To measure a distance and store distance and angles.
Stop
For GS:
To end measuring the point being staked. When
Automati-
cally stop point measurement
is checked in
GS Quality
Control
,
General
page recording of positions ends automat-
ically as defined by the stop criteria. The key changes to
Store
. After ending the measurements, the differences
between the measured point and the point to be staked are
displayed.
Store
For GS:
To store the measured point. When
Automatically store
point
is checked in
GS Quality Control
,
General
page, the
measured point is stored automatically. The key changes to
Measure
.
Stake,
page
Check panel,
page
Roads - Road
755