a
b
c
Road_098
a
Alignment
b
Defined chainage
c
Current position
α
Angle to alignment
1.
Measure a point:
For TS:
Distance
For GS:
Measure
and
Stop
2.
Press
Fn
Tools
to access the toolbox.
3.
Select
Get current angle to alignment
.
4.
At the defined chainage, the angle between the tangent direction
and the direction to the current position is calculated. This angle is
set as
Offset angle
for
Use non-perpendicular offset
on the
page.
5.
Continue with staking out using the calculated
Stake chainage
and
Offset angle
values. These values are valid until new values are
defined manually or by using
Get current angle to alignment
.
45.4.5
Stake individual point
This menu function is available for the stake/check of lines and local lines.
To stake out points with known Easting, Northing and Height. Points can either
be selected from the job or manually typed in.
If a design job has been selected, a point from the design job can be selected.
When staking out/checking an individual point, the selected point is set in rela-
tion to the alignment and all line relevant values are calculated and displayed.
The
Stake chainage
and
Offset
of the Stake panel are calculated based on
the coordinates of the selected point.
☞
If the chosen point has no height the design height is used. If the
point has a height it is possible to use that one or continue working
with the design height.
45.4.6
COGO Road - Alignment info
This menu function is available for staking/checking a line/local line.
This function allows
Graphic
Workflow
Availability
Description
Availability
Description
Roads - Road
769