TRANSMISSION AND CLUTCH 7-27
F ig u re 3 0 N — M a in s h a f t R e a r B e a r in g In sta lla tio n
chronizer on 4th speed gear clutching teeth before in
stalling 4th and 5th shift hub sleeve. Install sleeve re
tainer ring.
8. Install 4th and 5th synchronizer on shift hub sleeve.
9. Turn mainshaft assembly over and install 1st and rev
erse sliding gear with shift fork slot down.
REASSEMBLY OF TRANSMISSION
1. C oat countershaft pilot bearing needles with heavy
grease to hold in place until countershaft is installed.
2. Tip rear of countershaft down and into transmission
F ig u re 3 1 N — P o s it io n in g Lock B a lls a n d S p r in g s in S u p p o r t H o u s in g
F ig u re 3 2 N — C o v e r E x p lo d e
CHEVROLET SERIES 70-80 HEAVY DUTY TRUCK SH O P M A N U A L
Summary of Contents for 70 1969 Series
Page 1: ...CHEVROLET HEAVY DUTY TRUCK SHOP MANUAL...
Page 3: ......
Page 11: ...LUBRICATION 0 4 CHEVROLET SERIES 70 80 HEAVY DUTY TRUCK SHOP MANUAL...
Page 27: ......
Page 119: ......
Page 361: ......
Page 371: ......
Page 427: ......
Page 443: ......
Page 451: ......
Page 493: ......
Page 499: ......
Page 549: ......
Page 555: ......
Page 609: ......
Page 715: ...am...
Page 745: ......
Page 910: ......
Page 913: ......