
3–8 • Preliminary Cabling and Check
Synergy 100 Installation Guide (v16.10-S100)
8. While watching the monitor, move the fader from one limit to the other and verify that
the video
wipes
between color and black.
9. On the active bus, switch between two or three crosspoints to ensure that “cuts” are
taking place.
This completes the preliminary check. Once you are satisfied that video is switching and mixing,
please continue with the remaining connection procedures.
Basic Troubleshooting
Note the following basic troubleshooting points:
•
If you experience any problems with knobs, the fader, or the joystick during the
preliminary functional check, there may be a problem with switcher calibration or MLE
communications. Refer to the section “
instructions.
•
If the system is not switching and is not outputting video, there may be a problem with
the reference connection. Check that a valid digital reference is connected to the
601
REF IN
connector. The system will not output video if the reference signal is invalid or
not present.
•
If you have the
USB Removable Media Drive
option installed, you may receive the
error message, “
USB UPGD FAIL
” after restoring power to the control panel. Contact
Ross Video Technical Support for more information on correcting this error.
For other switcher problems, please contact
Ross Video Technical Support
.
Switcher Timeout
If no control panel buttons or knobs are touched and the fader arm is not moved for a period of 10
minutes, the switcher goes into a “sleep” mode and all lights are automatically turned off. If this
timeout occurs, press any button or move the fader or joystick to “wake” the switcher and turn on all
lights. Please note:
•
The switcher does
not
act on a button push when it is coming out of “sleep” mode.
•
The factory default timeout interval is 10 minutes. Refer to the section “
” on page 8–15 for instructions on programming an alternate timeout interval.
Содержание Synergy 100
Страница 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Страница 10: ......
Страница 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Страница 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Страница 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Страница 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Страница 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Страница 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Страница 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Страница 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Страница 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Страница 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Страница 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...