
2–18 • Installation
Synergy 100 Installation Guide (v16.10-S100)
6.
Cable Retainer
Loop the cable from the AC adaptor through the cable retainer on the back of the panel
for better security.
Installation Procedure
Use the following procedure to install remote Aux panels:
1. Install the appropriate panels in the desired locations for your facility.
2. Connect the supplied AC adapter to a suitable source of line voltage.
3. Plug the DC connector into the rear of the remote Aux panel.
4. Repeat steps 2 and 3 for each Aux panel.
This completes the remote Aux bus panel installation procedure.
Installing the Electronics Frame
The electronics frame is designed to be rack mounted. Note the following installation requirements:
•
Rack Units
: 2 RU
•
Height
: 3.5 inches (8.89 cm)
•
Depth
: 15.75 inches (40.01 cm)
•
Rack
: standard 19 inch wide equipment rack
Install the frame for maximum stability during operation and in such a way as to allow adequate
ventilation. Ensure that
both sides
of the frame are clear, so that switcher air flow is not restricted in
any way. The frame’s location should be accessible, reasonably dry and dust free.
Please note:
•
The system is shipped with the door on.
•
The system is shipped with all circuit boards installed and the power supply installed.
•
As a precaution after installation, ensure that the CPU board is tightly pushed into its
rear frame connector. The circuit board extractors on the sides of the board allow easy
installation and removal.
Note
There are no user-settable jumpers in the Aux panels.
Caution
If, for any reason, you remove a circuit board from the frame, it must
be put back in the exact same position. Failure to do so will result in
damage to the board, the frame, or both! Double check your work!
In order to provide adequate ventilation, the top and front panel covers
must be in place during operation.
Содержание Synergy 100
Страница 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Страница 10: ......
Страница 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Страница 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Страница 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Страница 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Страница 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Страница 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Страница 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Страница 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Страница 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Страница 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Страница 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...