
12–2 • Appendix C. Diagnostics
Synergy 100 Installation Guide (v16.10-S100)
Diagnostics Overview
The Synergy 100 switcher provides a full array of panel diagnostics tools.
Use the following procedure to enter panel diagnostic mode:
1. Hold down the following three buttons at once:
•
SEL
in the
Effects Control
Group
•
SEL
in the
Mattes
Group
•
SEL
in the
System Control
Group
2. A message will scroll across the 3 four-character displays in the
Effects Control
,
Mattes
, and
System Control
groups. The message advises the user that the control
panel is in diagnostic mode, and to exit, you must press and hold the three
SEL
buttons
again. This message will continue to scroll until a knob, button, the fader, or the joystick
is disturbed.
3. Once a knob, button, the fader, or the joystick has been disturbed, the seven-segment
display in the
System Control
group will flash between
LooP
, and either
PASS
or
FAIL
. This message advises you that a loop-back test has been performed on the
Synergy 100 control panel, with the results being either a PASS or a FAIL. The purpose
of the loop-back test is to ensure that proper communication exists between the control
panel and the Synergy 1 frame.
Each panel diagnostic function is discussed in the following sections.
Potentiometer Test
The
Potentiometer Test
allows you to test the response of all potentiometers (knobs) on the panel.
Use the following procedure to test the pots:
1. Select a knob to test, and rotate it fully clockwise and counter-clockwise.
2. This action causes the following information to appear in the 3 four-character displays:
•
In the
Effects Control
Group
,
Knob
appears in the display.
•
In the
Mattes
Group
, a range of numerical values appears in the display.
•
In the
System Control
Group
, the name and location of the knob appears in the
display (for example,
Dgan
for the
GAIN
knob in the
Downstream Keyer
Group
or
KClp
for the
CLIP
knob in the
Effects Keyer
Group
).
In addition, the LEDs in the
Transition Progress Bar
will illuminate.
3. Test each panel potentiometer as required.
This completes the procedure to test the pots.
Note
This test
must
be performed with either the Synergy 1 frame or a
Loop-back connector attached to
SYNERGY
communication port on
the rear of the Synergy 100 control panel. Otherwise, a
FAIL
result
will be received.
Note
Contact
Technical Support
for details on each display value.
Содержание Synergy 100
Страница 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Страница 10: ......
Страница 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Страница 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Страница 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Страница 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Страница 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Страница 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Страница 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Страница 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Страница 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Страница 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Страница 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...