
8–26 • Additional Installation Setups
Synergy 100 Installation Guide (v16.10-S100)
~
Edge
— Use this option to have the GPI input port’s line held at the selected
state (low or high) until triggered, whereupon the line switches to the opposite
state momentarily – and returns immediately to the original state.
~
Level
— Use this option to have the GPI input port’s line is held at the selected
state (low or high) until triggered, whereupon the line switches to the opposite
state – and holds there.
•
Press the right
SEL
button to accept the new settings.
9. Press
MENU
to display the
Installation Change Screen
.
10. Accept or cancel these changes as follows:
•
Press
0. Confirm
to accept the changes.
•
Press
1. Cancel
to exit the menus safely, without making any changes. The system
returns to the previously stored settings.
This completes the procedure to set up Frame GPIs.
Standard GPI Connections
In this section, using the “
Standard GPI Input Worksheet
” as a guide, you will wire each GPI port
that you have assigned to source devices.
The GPI connector is located on the rear of the frame as shown on the following diagram:
GPI Connector
•
Using the “
Standard GPI Pinout Table
” provided in Appendix A and the data from
your “
Standard GPI Input Worksheet
”, wire your GPI input ports 1-12 (or simply the
number of ports that you assigned) to each source device. Refer to your source device’s
Installation Manual
for pinout information on the device’s individual GPI output ports.
Refer to the section “
Standard GPI I/O Connector Pinouts
” on page 10-13 for standard GPI
connector specifications.
Notes on Using Standard GPI Connections
Please note:
•
Standard GPI Connector type: 25-pin “D” SUB Female
•
GPI In 1-12: TTL-compatible inputs
•
Run all GPI cables in accordance with good engineering practice and ensure that the
cable will not be subjected to physical abuse.
Note
To trigger a GPI to perform a DSK transition, that is, if you selected
DSK
at the
Area
heading, the
Type
must
be set to
Level
.
GPI I/O
TALLY
9
11
13
15
10
12
14
16 COMMON
2
1
Aux 10 Aux 1
PV1
Clean
1
3
5
7
2
4
6
8 COMMON
Содержание Synergy 100
Страница 1: ...Ross Video Limited Installation Guide Software Issue 16 10 S100...
Страница 10: ......
Страница 16: ...vi Contents Synergy 100 Installation Guide v16 10 S100...
Страница 66: ...2 32 Installation Synergy 100 Installation Guide v16 10 S100...
Страница 88: ...5 6 Using the Menu System Synergy 100 Installation Guide v16 10 S100...
Страница 100: ...6 12 BNC Configuration and Check Synergy 100 Installation Guide v16 10 S100...
Страница 134: ...7 34 Communication Setup Synergy 100 Installation Guide v16 10 S100...
Страница 170: ...8 36 Additional Installation Setups Synergy 100 Installation Guide v16 10 S100...
Страница 186: ...9 16 Completing Setup Synergy 100 Installation Guide v16 10 S100...
Страница 208: ...10 22 Appendix A Specifications Synergy 100 Installation Guide v16 10 S100...
Страница 216: ...11 8 Appendix B Hardware Options Synergy 100 Installation Guide v16 10 S100...
Страница 234: ...GL 4 Glossary of Terms Synergy 100 Installation Guide v16 10 S100...
Страница 246: ...IX 12 Index Synergy 100 Installation Guide v16 10 S100...