7. Remove the power steering oil pump drive belt. (See
DRIVE BELT REMOVAL/INSTALLATION
[MZI-3.5]
.)
8. Remove the power steering oil pump. (see
POWER STEERING OIL PUMP
REMOVAL/INSTALLATION
.)
9. Remove in the order indicated in the table.
10. Install in the reverse order of removal.
11. Start the engine and:
1. Inspect the runout and contact on the pulley and belt.
2. Inspect for engine oil, engine coolant, ATF, power steering fluid and fuel leakage.
3. Verify the ignition timing, idle speed and idle mixture. (See
ENGINE TUNE-UP [MZI-3.5]
.)
4. Engine accessories operation.
12. Perform a road test.
Fig. 16: Lifting Engine
Courtesy of MAZDA MOTORS CORP.
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:19:27 AM
Page 17
© 2005 Mitchell Repair Information Company, LLC.