z
If there is continuity, there is a short circuit. Repair or replace the wiring harness.
{
Throttle body terminal C and power supply
{
Throttle body terminal C and body ground
{
Throttle body terminal D and body ground
{
Throttle body terminal E and power supply
{
Throttle body terminal F and body ground
{
Throttle body terminal F and power supply
ACCELERATOR PEDAL POSITION (APP) SENSOR INSPECTION [MZI-3.5]
VOLTAGE INSPECTION
1. Turn the ignition switch to the ON position (Engine OFF).
2. Verify that the PCM terminal 1AC, 1AG and 1AK change smoothly while throttle valve is gradually
opened.
z
If as verified, go to next step.
z
If not as verified, perform the "Circuit Open/Short Inspection".
If there is no open or short circuit, replace the throttle body.
3. Verify that the PCM terminal 1AC, 1AG and 1AK voltages are as shown in the following table.
Fig. 15: Identifying PCM Connector 1 Terminals
Courtesy of MAZDA MOTORS CORP.
NOTE:
z
Before performing the following inspection, make sure to follow the
procedure as indicated in the troubleshooting flowchart. (see HOW TO
USE THIS MANUAL .)
2007 Mazda CX-9 Grand Touring
2007 ENGINE PERFORMANCE Control System (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:25:31 AM
Page 17
© 2005 Mitchell Repair Information Company, LLC.