z
If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
{
PCV valve heater fitting terminal A and main relay No.1 terminal D
{
PCV valve heater fitting terminal B and PCM terminal 2AU
Short circuit
z
If there is continuity, there is a short circuit. Repair or replace the wiring harness.
{
PCV valve heater fitting terminal A and power supply
{
PCV valve heater fitting terminal A and body ground
{
PCV valve heater fitting terminal B and power supply
{
PCV valve heater fitting terminal B and body ground
ROLLOVER VALVE REMOVAL/INSTALLATION [MZI-3.5]
ROLLOVER VALVE INSPECTION [MZI-3.5]
1. Perform the fuel tank inspection. (see
FUEL TANK INSPECTION [MZI-3.5]
.)
FUEL SHUT-OFF VALVE REMOVAL/INSTALLATION [MZI-3.5]
FUEL SHUT-OFF VALVE INSPECTION [MZI-3.5]
1. Perform the fuel tank inspection. (see
FUEL TANK INSPECTION [MZI-3.5]
.)
QUICK RELEASE CONNECTOR (EMISSION SYSTEM)
REMOVAL/INSTALLATION [MZI-3.5]
NOTE:
z
The rollover valve cannot be removed as it is built into the fuel tank.
NOTE:
z
The rollover valve cannot be disassembled and inspected as it is built into
the fuel tank.
NOTE:
z
The fuel shut-off valve cannot be removed as it is built into the fuel tank.
NOTE:
z
The fuel shut-off valve cannot be removed and inspected as it is built into
the fuel tank.
WARNING:
z
Fuel is very flammable liquid. If fuel spills or leaks from the
pressurized fuel system, it will cause serious injury or death and
facility breakage. Fuel can also irritate skin and eyes. To prevent
2007 Mazda CX-9 Grand Touring
2007 ENGINE PERFORMANCE Emission System (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:24:50 AM
Page 18
© 2005 Mitchell Repair Information Company, LLC.