Fig. 14: Inspecting Continuity Between Terminal S And Body Using Tester
3. Verify that there is no continuity between terminals M and B using a tester.
z
If there is continuity, replace the magnetic switch.
Fig. 15: Checking Continuity Between Terminals M And B Using Tester
Brush and brush holder
1. Verify that there is no continuity between each insulated brush and plate using a tester.
z
If there is continuity, replace the brush holder.
Fig. 16: Checking Continuity Between Insulated Brush And Plate Using Tester
2. Measure the brush length.
z
If any brush is worn almost to or beyond the minimum specification, replace all of the brushes.
Starter brush length
Standard: 12.3 mm {0.48 in}
Minimum: 5.5 mm {0.22 in}
2007 Mazda CX-9 Grand Touring
2007 ENGINE Starting System (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:28:58 AM
Page 8
© 2005 Mitchell Repair Information Company, LLC.