Fig. 26: Identifying Front HO2S & PCM Related Connector Terminals
Courtesy of MAZDA MOTORS CORP.
Open circuit
z
If there is no continuity, the circuit is open. Repair or replace the harness.
{
HO2S (RH) terminal A and PCM terminal 2J
{
HO2S (RH) terminal B and PCM terminal 2Y
{
HO2S (RH) terminal C and main relay No.2 terminal D
{
HO2S (RH) terminal D and PCM terminal 2AL
{
HO2S (LH) terminal A and PCM terminal 2E
{
HO2S (LH) terminal B and PCM terminal 2U
{
HO2S (LH) terminal C and main relay No.2 terminal D
{
HO2S (LH) terminal D and PCM terminal 2AL
Short circuit
2007 Mazda CX-9 Grand Touring
2007 ENGINE PERFORMANCE Control System (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:25:31 AM
Page 29
© 2005 Mitchell Repair Information Company, LLC.