Optional Configuration Tasks
You can perform the following optional PPP configuration tasks:
■
Add a text description or alias to a PPP interface.
■
Configure the IPCP netmask option (option 0x90).
■
Specify the keepalive timeout value.
■
Disable magic numbers.
■
Control validation of the LCP peer magic number when the peer has not
negotiated an LCP magic number.
■
Configure the maximum number of LCP, IPCP, or IPv6CP renegotiation attempts
that the router accepts before terminating a PPP session.
■
Specify the maximum receive units.
■
Configure passive mode.
■
Configure name server addressing.
■
Stop or restart a PPP session.
■
Configure PPP authentication.
ppp description
■
Use to assign a text description or alias to a static PPP interface.
■
Example
host1(config-if)#
ppp description pah8999
■
Use the
no
version to remove the description.
■
See ppp description.
ppp ipcp lockout
■
Use to terminate invalid IPv4 subscribers and prevent additional IPCP
negotiations.
■
When Internet Protocol version 6 Control Protocol (IPv6CP) is active, this
command enables unused IPv4 addresses, which are allocated for the IPv6
subscribers, to be available for the IPCP services for an internally defined time
interval (10 seconds). When the time interval elapses, the subscriber must connect
again to negotiate IPCP.
■
Example
host1(config-subif)#
ppp ipcp lockout
■
Use the
no
version to disable the IPCP lockout option on the interface.
■
See ppp ipcp lockout.
ppp ipcp netmask
278
■
Optional Configuration Tasks
JUNOSe 11.1.x Link Layer Configuration Guide
Summary of Contents for JUNOSE 11.1.X - LINK LAYER CONFIGURATION 4-7-2010
Page 6: ...vi...
Page 8: ...viii JUNOSe 11 1 x Link Layer Configuration Guide...
Page 26: ...xxvi List of Figures JUNOSe 11 1 x Link Layer Configuration Guide...
Page 34: ...2 Chapters JUNOSe 11 1 x Link Layer Configuration Guide...
Page 230: ...198 Monitoring VLAN and S VLAN Subinterfaces JUNOSe 11 1 x Link Layer Configuration Guide...
Page 258: ...226 Monitoring 802 3ad Link Aggregation JUNOSe 11 1 x Link Layer Configuration Guide...
Page 334: ...302 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Page 394: ...362 Monitoring Multiclass MLPPP JUNOSe 11 1 x Link Layer Configuration Guide...
Page 406: ...374 Monitoring POS JUNOSe 11 1 x Link Layer Configuration Guide...
Page 468: ...436 Troubleshooting JUNOSe 11 1 x Link Layer Configuration Guide...
Page 498: ...466 Monitoring Bridged Ethernet JUNOSe 11 1 x Link Layer Configuration Guide...
Page 546: ...514 Monitoring Cisco HDLC JUNOSe 11 1 x Link Layer Configuration Guide...
Page 747: ...Part 2 Index Index on page 717 Index 715...
Page 748: ...716 Index JUNOSe 11 1 x Link Layer Configuration Guide...
Page 774: ...742 Index JUNOSe 11 1 x Link Layer Configuration Guide...