
Instructions for Use Fabius MRI SW 3.n
83
Getting Started
NON-FUNCTIONAL
A serious fault was detected and operation of the
monitor and ventilator is inhibited. Do not use the
machine. Immediately call DrägerService or your
local authorized service organization to correct the
problem.
Power-Up Standby Screen
Following a successful power-up, the Standby
screen appears and provides instructions on start-
ing the operation of the Fabius MRI.
Checking Readiness for Operation
Check the readiness of the Fabius MRI by testing
all required components as specified in the daily
and pre-use checkout provided in the appendix of
this manual. If all checks are satisfactorily com-
pleted, begin operation as specified in “Operation”
on page 85.
WARNING
The power-on self-test should be carried out
once a day.
Switch Fabius MRI off and on or start the self-
test by pressing the soft key
»Run System Test«.
501
Summary of Contents for Fabius
Page 36: ...36 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 84: ...84 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 130: ...130 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 192: ...192 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 215: ...Instructions for Use Fabius MRI SW 3 n 215 Technical Data 311 ...
Page 216: ...216 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 218: ...218 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 226: ...226 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 228: ...228 Instructions for Use Fabius MRI SW 3 n This page intentionally left blank ...
Page 231: ...Instructions for Use Fabius MRI SW 3 n 231 This page intentionally left blank ...