![APRILIA DORSODURO FACTORY ABS 2011 Service Station Manual Download Page 292](http://html.mh-extra.com/html/aprilia/dorsoduro-factory-abs-2011/dorsoduro-factory-abs-2011_service-station-manual_2956329292.webp)
Get the suitable tool for the tightening of the ring
nut. Carry out the following operations:
- carry out a first tightening of the ring nut to the
indicated tightening torque for the settlement of the
steering package.
- turn the steering completely from both sides, for
several times.
Loosen the ring nut completely.
- carry out the final tightening of the ring nut to the
indicated tightening torque.
Specific tooling
020884Y
46 mm wrench for steering ring nut
S
TEERING
RING
NUT
pos.
Description
Type
Quantity
Torque
Notes
1
Headstock ring nut - pre-tightening
M25x1
1
30 Nm (22.13 lbf ft)
Steering package
settlement
1
Headstock ring nut - tightening
M25x1
1
12 Nm (8.85 lbf ft)
-
•
Fit the entire fork upper plate, adjusting
with short taps with a rubber hammer.
•
Scatter the nut thread with the specific
product and pre-fit it to the indicated
tightening torque.
Recommended products
LOCTITE® 243
Loctite adhesive to assemble
cylindrical pieces
Loctite adhesive to assemble cylindrical pieces
•
Tighten the fixing screws of the upper
plate to the prescribed tightening tor-
que.
Suspensions
DORSODURO FACTORY ABS
SUSP - 292
Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
email: [email protected]
Summary of Contents for DORSODURO FACTORY ABS 2011
Page 379: ......