6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 576 -
PLC#2, Table 4.2-17 for PLC#3, Table 4.2-19, and Table 4.2-21 for the outputs.
Output signal to BO
The DPSY01 function, in Figure 4.2-31, can issue an “Operate” signal at the output point
“DPSY01_FEX_BO”, when the DPSY01 function determines that the signal “Local-Open-
Control” is true.
(v)
Receiving “operate command Closing” using the PLC logic
Figure 4.2-27 outlines the reception of the operate command closing with the PLC function.
Do nothing
Operation
decision
Success
Failed
Operate logic
Wait for a command
Signal output
Operate command Closing l from the local-end
Operate command Closing from the remote-end
Operate command Closing by the PLC function
Operate command Open by the PLC function
Wait for a next command
Select stage
Select command Open from the remote-end
Select command Closing from the remote-end
Select command Open from the local-end
Select command Closing from the local-end
Select command Closing by the PLC function
Select command Open by the PLC function
Operate command Open from the remote-end
PLC logic programmed
by the user l
Operate command Open from the local-end
Figure 4.2-27 Outline of operate command closing
Input signal from the PLC function
Figure 4.2-28 describes the operate logic when an “Operate command Closing (PLC-Closing-
Control)” signal is generated by the PLC function. There are four input points for reception of
the signal “operate command closing”. The input point is selected in accordance with one of the
following four conditions: for the first condition, the issue of the operate command to the device
is decided in coordination with checks for both the ILK and the SYNCHK functions, the signal
is applied at connection point (PLC#1: i.e., “DEV01_CL_SYNC_INTER”) (Table 4.2-3). For the
second condition, the issue of the operate command for the device is determined in coordination
with a check using the SYCHK function only, the signal is applied at connection point (“PLC#2:
i.e., “DEV01_CL_SYNC”) (Table 4.2-3). If the third condition is used, the issue of the operate
command for the device is determined in coordination with a check using the ILK function only,
apply the signal at connection point (“PLC#3: i.e., DEV01_CL_INTERLOCK”) (Table 4.2-3).
Regarding the fourth condition, the issue of the operate command to the device is made with
no check, the signal is applied at connection point (“PLC#4: i.e., DEV01_CL_COMMAND”)
(Table 4.2-3). Note that the user should set
PLC
for scheme switch [
DPSY-LGCTRCON
].
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......