6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 1162 -
IEC 61850 communication
Figure 11.3-1 shows a substation automation system (SAS) and a number of IEDs connected
via a Ring LAN (100BASE-FX). The IEDs can have communication with other devices using
the international standard protocol (IEC 61850 standard‡); additionally, the ring network
topology is used to achieve network redundancy in the system. The user should use the GR-
TIEMS to configure the protocol in the IEC 61850 standard. That is, the functions for the
protection, the measurement, monitoring at local and remote, controlling and logging the data
are required to program in the IEC 61850 standard.
Substation
Computer
Router/
Modem
Communication
Network
Remote
Monitoring
Fiber Optic Ring: 100BASE-FX
Operator
Workstation
Printer
Engineering
Workstation
GPS
GBU GRT GRG
GBU GRL GRB
GBU GRG GRZ
GBU GRT GRL
CONTROL
SNTP
MEASUREMENT
GOOSE
Ethernet LAN (TCP/IP)
Figure 11.3-1 SAS network using IEC 61850 protocol
†Note: When applying IEC 61850 communications, the user should map application
signals with the required logical-nodes (LNs) within the IED. In this manual, we
show the application signals as Data IDs; hence, the user is able to connect the
Data IDs with the required LNs using the engineering tool (GR-TIEMS) provided
by Toshiba. For the GR-TIEMS, see Chapter
Engineering tool.
‡Note: Before using the IEC 61850 communications feature provided within the IED, the
user should verify its IEC 61850 capability by reviewing both the protocol-
implementation-conformance-statement (PICS) and the model-implementation-
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......