6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 824 -
apply the signal at other connection point (PLC#4; i.e., DEV01_P1_COMMAND). We should
assume the PLC#3 and PLC#4 as PLC#1 and PLC#2 in Table 4.9-2. Note that the user should
set
PLC
for scheme switch [
TPOS01-LGP1EXOT
].
TPOS01 function (Function ID: 513001)
Assign to BOs
Operate Cmd.
with ILK
† condition
S
R
0.1
– 50.0 s
[
TPOS01-CPW
]
Operate Cmd.
without ILK
† condition
Operate condition
‡
[
TPOS01-LGCTRCON
]
Fixedlogic
Fixedlogic
[
TPOS01-LGP1EXOT
]
Command
“PLC-P1-Control” requiring ILK check
(PLC#3 connection point)
ILK
†
condition (“P1”) passed
TPOS1-P1
TPOS01IN_TMP_27
513001 800401EE56
User configurable condition
(PLC#1 connection point)
“TPOS01_P1EC_OK_CSF”
(513001 8004011E7E)
&
&
1
≥
&
1
≥
1
≥
&
&
&
“TPOS01_P1EX_BO”
(5130018104011DD0)
§§
Input
Output
Operate logic in TPOS01
To BO connection
“TPOS01_P1EC_OK_CS”
(5130018004011E81)
[
TPOS01-PLSM
]
*
Fix
Var
Operate Failed
[
TPOS01-RST
]
ASEQ function
§
” is in progress
ASEQ_MULTI_SEL
“TPOS01_P1EC_OK_CSF”
(513001 8004011E7E)
“TPOS01_EX_FFL”
(513001 8604011E91)
‡‡
To
“Wait for a command”
&
Detection of state-change in a device
&
TPOS01IN_TMP_38
513001 820401EE5E
User configurable condition
(PLC#2 connection point)
1
≥
&
“TPOS01_EX_CMP”
(5130018004011E93)
Operate Completed
1.0s- 100.0s
0
t
DEV01_P1_INTERLOCK
513001 800401EE31
Command
“PLC-P1-Control” not requiring ILK check
(PLC#4 connection point)
DEV01_P1_COMMAND
513001 800401EE30
Figure 4.9-39 Operate P1- control using the PLC function in TPOS01
††
†Note: The ILK function can provide the criteria for operation for “P1” control.
‡Note: An “operate condition” signal is generated in the operate-condition logic (Figure
Fixlogic
is set for scheme switch [
TPOS01-LGCTRCON
]. If an
alternative “operate-condition” programmed by the user is required in place of the
signal generated by the original operate-condition logic, connect the alternative
“operate-condition” to the logic shown in Figure 4.9-39 using connection point #1
“User configurable condition” That is, set the scheme switch [
TPOS01-
LGCTRCON
] to
PLC
and use “TPOS01IN_TMP_27”.
§Note: The ASEQ function can provide sequential signals for automatic control.
*Note: The user can set the type of output signal. When
Var
is set the scheme switch
[
TPOS01-PLSM
], the output period of the signal is defined by the setting applied
to [
TPOS01-CPW
]. When
Fix
is set, the signal ceases when the 43S or an ES is
changed.
††
Note: To identify the input and output signal-points of the P1-control in the other TPOS
logics, see Table 4.9-15 for PLC#1, Table 4.9-16 for PLC#2 and Table 4.9-20 for the
outputs.
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......