6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 800 -
PLC logic programmed
by the user
P3control by the PLC function
Signal output
Select
decision
Success
Failed
Selection logic
P2 control from the remote-end
P3 control from the remote-end
P1 control from the local-end
P2 control from the local-end
P1 control by the PLC function
P3 control from the local-end
P2 control by the PLC function
Select stage
Cancel logic
Wait for a command
Cancel command
Wait for a command
Operate logic
Operate command
Cancel logic
Operate logic
P1 control from the remote-end
Figure 4.9-18 Outline of select command ’P3-control’
Input signal from the PLC function
Figure 4.9-9 shows the select logic when a “Select command P3-Control (PLC-P3-Control)”
signal is generated by the PLC function. There are two input points for the reception of this
signal, like in the “Select Command P1-Control (PLC-P1-Contol)” signal. That is, if interlock
checking is required, use the connection point (PLC#1; e.g., DEV01_P3_INTERLOCK).
Alternatively, if the interlock check is not required, use the connection point (PLC#2; e.g.,
DEV01_P3_COMMAND). PLC#1 and PLC#2 are shown in Table 4.9-4.
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......