6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 370 -
(xiv)
Reclosing sequence for two CBs system– setting (ARC-ORDER)
Figure 2.24-23 shows that the logic determines the reclosing priority between CB#1 and CB#2;
the scheme switch [
ARC-ORDER
] is provided to set the process priority. For example, the user
should set
CB1
for the [
ARC-ORDER
] if the CB#1 is being closed firstly.
Table 2.24-10 Starting condition for two CBs system
Mode setting
Setting [
ARC-
ORDER
]
Start condition
[
ARC1 mode
]=
TPAR
or
SPAR&TPAR
[
ARC2 mode
]=
TPAR
or
SPAR&TPAR
CB1
CB#1 recloses first.
CB2
CB#2 recloses first.
SIMUL
Both CB#1 and CB#2 reclose simultaneously.
≥1
TPAR1-START
810001EBBD
8000011B73
NON ARC-S1_IN-PROG
ARC1 SHOT1
S
R
ARC2 SHOT
Shot1 for CB#1
Shot for CB#2
S
R
Start
ARC-ORDER
CB2
CB1
SIMUL
≥1
Not connected
TPAR1_START
ARC1 TPAR
TPAR2-START
810002EBBD
8100021B6F
TPAR2_START
ARC2 TPAR
≥1
8800011B74
S
R
S
R
≥1
ARC1-SUB_INIT
8900021B70
ARC2-SUB_INIT
For user’s programming
FT ARC2 UNREADY
FT ARC1 UNREADY
Initiation
Figure 2.24-23 Reclose sequence logic
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......