Revision-up Records
Rev. and
Date
Section
(page)
Change place and contents
Approved
by
Checked by
Prepared
by
--
Jun. 30, 2015
--
First edition
K. Kobayashi
Jun. 30
M. Okai
Jun. 30
T. Kaneko
Jun. 30
0.01
July 15, 2015
Chap. 10.11
App
Revised the contents at Sigma Iy function
Function table revised in the ordering
K. Kobayashi
July 15
T. Nagano
July 15
T. Kaneko
July 3
0.02
Aug 26, 2015
Chap. 1.1
Revised the discussion for protection relays
K. Kobayashi
Aug 17
M. Okai
Aug 17
T. Kaneko
Aug 17
Chap. 2.1
Added PSB characteristic in Quad characteristic
Added the meaning of setting CovCoeff
M. Okai
Aug.17
A. Morimoto
Aug 17
T. Kaneko
Aug 17
Chap. 2.1.2
Revised the features of Z1 offset action
H. Amoh
Aug 1
A. Morimotoi
Aug 1
T. Kaneko
July 30
Chap. 2.5
Added the OC minimum sensing voltage for polarizing
Added the rating current depends on the VCT setting
K. Kobayashi
Aug 1
K. Ohashi
Aug 1
T. Kaneko
July 30
Chap.2.6, 2.7
Added the rating current depends on the VCT setting
in EF and OCN
K. Kobayashi
Aug 1
M. Okai
Aug 1
T. Kaneko
July 30
Chap. 2.17
Added the setting notice about threshold settings for
blocking the operation of FRQ
K. Kobayashi
Aug 1
S. Gondou
Aug 20
T. Kaneko
Aug. 20
Chap. 2.23
Corrected the logic for trigger signals in the FL
Added the trigger for data saving and calculations
M. Okai
Aug.20
A. Fuku
Aug.20
T. Kaneko
Aug 20
Chap. 2.25
Modified the erroneous voltage checking condition in
zone D2 in Table 2.25 of VCHK
K. Kobayashi
Aug 7
M. Okai
Aug.7
T. Kaneko
Aug 7
Chap. 11.3
Replace the USB description to Chap 11 from Chap 5
K. Kobayashi
Aug 25
M. Okai
Aug 25
T. Kaneko
Aug. 25
Chap. 13
Added the module implementation procedures
Removed the module replacement procedures
K. Kobayashi
Aug 1
F. Yamazaki
Aug 1
T. Kaneko
July 30
Appendix
Tables of BIO codes modified
K. Kobayashi
Aug 26
N. Yokoya
Aug 26
T. Kaneko
July 30
0.03
Sep 4, 2015
Chap. 2.27
Revised the PROT_COM.
K. Kobayashi
Sep 4
N. Nagano
Sep 4
T. Kaneko
Sep 4
0.04
Oct 15 2015
Chap. 4
Added DPOS and TPOS functions
K. Kobayashi
Oct 14
K. Kobayashi
Oct 14
T. Kaneko
Oct. 14
Chap. 5.5
Revised the operation meanings at the FAIL1 and
Fail2 contacts; revised the operation conditions
K. Kobayashi
Oct. 8
T. Ohnari
Oct. 5
T. Kaneko
Sep. 25
Chap. 10
Revised whole contents
K. Kobayashi
Oct 14
K. Kobayashi
Oct 14
T. Kaneko
Oct. 14
Appendix 2
Modified the height of the VCT to 38 mm.
M. Ueda
Oct 11
M. Ueda
Oct 11
T. Kaneko
Oct. 11
Appendix 5
Tables of BIO codes modified
K. Kobayashi
Sep 11
N. Yokoya
Sep 10
T. Kaneko
Sep 9
Appendix 5
Revised typos about the VCT in Ordering
T. Nakatsuka
Oct 2
T. Nakatsuka
Oct 2
T. Kaneko
Oct. 2
Appendix 5
Revised Function table for 32 model
K. Kobayashi
Oct 14
K. Kobayashi
Oct 14
T. Kaneko
Oct. 14
Appendix 6
Modified at contact spec. of BO circuits as to Break
capability when 0.2A current flowing
T.Sugamoto
Sep. 10
T.Sugamoto
Sep. 10
T. Kaneko
Sep. 10
0.05
Oct 16, 2015
Chap. 10.2
Removed the duplicated contents in sec. 10.2.22 and
10.2.23
F. Kawano
Oct 16
F. Kawano
Oct 16
T. Kaneko
Oct. 15
Appendix 6
Deleted the descriptions about the function standard
in the IEC
F. Kawano
Oct 16
F. Kawano
Oct 16
T. Kaneko
Oct. 15
0.06
Nov 4, 2015
Chap. 2.1
Typos revised in Fig 2.1-19,20,21,23,24,25,26,27, and
30. Setting ranges revised in CovCoeff setting
K. Kobayashi
Oct. 23
M. Oohashi
Oct. 23
T. Kaneko
Oct. 22
Chap. 5.5
Appendix 6
Added the notice not to guarantee the operation on the
AC power source
T.Sugamoto
Nov. 4
T.Sugamoto
Nov. 4
T. Kaneko
Nov. 4
Appendix 1
Organized signal lists
T. Nakatsuka
Oct. 30
T. Nakatsuka
Oct. 30
T. Kaneko
Oct. 30
Summary of Contents for GR 200 Series
Page 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Page 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Page 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Page 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Page 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Page 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Page 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Page 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Page 1563: ......