
4.9.2 Adjustment Procedure
P.4-17
4.9 Head Height Adjustment
VJ1324E-M-02
7.
If the carriage does not pass through the gap of 1.1mm and pass through 1.3mm,
readjust PG height by moving two height adjust cams on both left and right of
carriage.
1.1mm.
• To raise head height: Rotate cam upward.
• To lower head height: Rotate cam downward.
NOTE
The left and right cams change the height separately. Make sure to follow the
steps 3 to 6 and check both left and right of the head height is proper by using
PG height adjusting jigs.
8.
Apply adhesion bond to the height adjustment cam and fix the height.
9.
To reassemble the unit, reverse the removal procedure.
No.
Name
1
Height adjustment cam
2
Carriage
1
2
Summary of Contents for ValueJet VJ-1324
Page 1: ...VJ1324E M 02 VJ 1324 Full Color Inkjet Printer MAINTENANCE MANUAL ...
Page 86: ...P 3 4 VJ1324E M 02 3 13 7 Replacing Peripheral Devices of VJ Take Up Unit Motor Assy 3 179 ...
Page 409: ...P 10 1 VJ1324E M 02 10 Appendix 10 1 Introduction 10 2 10 2 Maintenance Part List 10 2 ...
Page 419: ......
Page 420: ......