
3.7.9 Replacing Y Fitting
P.3-123
3.7 Replacing Carriage Peripherals
VJ1324E-M-02
3.7.9
Replacing Y Fitting
1.
Perform ink drainage operation and drain ink from all the ink path.
2.
Remove Front Cover.
"3.2.4 Removing Front Cover and Replacing Front Cover Holder" p.3-13
3.
"3.2.4 Removing Front Cover and Replacing Front Cover Holder" p.3-13
4.
Remove Top Cover.
"3.2.6 Removing Top Cover" p.3-16
5.
Remove I/H Cover.
"3.2.1 Removing I/H Cover" p.3-7
6.
Remove Side Cover R.
"3.2.2 Remove Side Cover R" p.3-8
7.
Remove I/H Cover.
"3.2.1 Removing I/H Cover" p.3-7
8.
Remove Ink tubes ( 3 pieces) from Y Fitting (1 piece) .
9.
Replace Y Fitting(1 piece).
10. To reassemble the unit, reverse the removal procedure.
11. Charge ink.
No.
Name
1
Y Fitting
2
Ink tube
1
2
2
Summary of Contents for ValueJet VJ-1324
Page 1: ...VJ1324E M 02 VJ 1324 Full Color Inkjet Printer MAINTENANCE MANUAL ...
Page 86: ...P 3 4 VJ1324E M 02 3 13 7 Replacing Peripheral Devices of VJ Take Up Unit Motor Assy 3 179 ...
Page 409: ...P 10 1 VJ1324E M 02 10 Appendix 10 1 Introduction 10 2 10 2 Maintenance Part List 10 2 ...
Page 419: ......
Page 420: ......