
3.7.14 Removing Cutter Holder
P.3-131
3.7 Replacing Carriage Peripherals
VJ1324E-M-02
3.7.14
Removing Cutter Holder
NOTE
Using dedicated Jig to assemble Cutter Holder.
1.
Remove I/H Cover.
"3.2.1 Removing I/H Cover" p.3-7
2.
Remove Side Cover R.
"3.2.2 Remove Side Cover R" p.3-8
3.
Remove Front Cover.
"3.2.4 Removing Front Cover and Replacing Front Cover Holder" p.3-13
4.
Remove Top Cover.
"3.2.6 Removing Top Cover" p.3-16
5.
Move Carriage toward the center of Platen.
"3.7.1 How To Release Carriage Lock" p.3-98
6.
Remove carriage cover.
"3.7.2 Removing Carriage Cover" p.3-99
7.
Remove CR board Assy.
"3.7.3 Removing CR Board Cover" p.3-100
8.
Remove Photometer JUNCTION Board Assy.
"3.7.13 Replacing Photometer JUNCTION Board Assy" p.3-128
9.
Remove spring from PF adjusting Lever.
10. Remove screws (2 pieces) retaining Cutter Holder.
T I P
Dedicated Jig
No.
Name
1
PG adjusting Lever
2
Spring
3
Pan-head screw with spring washer and flat washerM3
×
8 Ni-3
4
Cutter Holder
2
3
1
4
4GOQXGF%WVVGT*QNFGT
Summary of Contents for ValueJet VJ-1324
Page 1: ...VJ1324E M 02 VJ 1324 Full Color Inkjet Printer MAINTENANCE MANUAL ...
Page 86: ...P 3 4 VJ1324E M 02 3 13 7 Replacing Peripheral Devices of VJ Take Up Unit Motor Assy 3 179 ...
Page 409: ...P 10 1 VJ1324E M 02 10 Appendix 10 1 Introduction 10 2 10 2 Maintenance Part List 10 2 ...
Page 419: ......
Page 420: ......