5. Remove the ignition coils. (see
IGNITION COIL REMOVAL/INSTALLATION [MZI-3.5]
.)
6. Remove the dipstick.
7. Remove the power steering oil pump drive belt. (See
DRIVE BELT REMOVAL/INSTALLATION
[MZI-3.5]
.)
8. Remove the power steering oil pump. (see
POWER STEERING OIL PUMP
REMOVAL/INSTALLATION
.)
9. Follow the "TIMING CHAIN REMOVAL/INSTALLATION" procedure and removal the timing chain.
(See
TIMING CHAIN REMOVAL/INSTALLATION [MZI-3.5]
.)
Fig. 124: Lifting Engine And Transaxle
Courtesy of MAZDA MOTORS CORP.
10. Remove in the order indicated in the table.
11. Install in the reverse order of removal.
12. Start the engine and:
1. Inspect the runout and contact on the pulley and belt.
2. Inspect for engine oil, engine coolant, ATF, power steering fluid and fuel leakage.
3. Verify the ignition timing, idle speed and idle mixture. (See
ENGINE TUNE-UP [MZI-3.5]
.)
4. Engine accessories operation.
13. Perform a road test.
CAUTION:
z
When removing the timing chain and marking the timing marks
on the chain, mark the camshaft timing chain as well.
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:19:28 AM
Page 79
© 2005 Mitchell Repair Information Company, LLC.