Fig. 61: Identifying Timing Marks
Courtesy of MAZDA MOTORS CORP.
9. Loosen the LH bank camshaft cap bolts in several passes in the order shown in the figure and remove the
camshaft cap.
Fig. 62: Identifying Camshaft Cap Bolts Removal Sequence
Courtesy of MAZDA MOTORS CORP.
10. Remove the camshaft, camshaft sprocket, camshaft timing chain, and camshaft timing chain tensioner of
the LH bank as a single unit.
11. Slowly compress the camshaft timing chain tensioner (RH) piston by hand.
12. Insert an
approx. 1.0 mm {0.039 in}
thin wire or paper clip into the camshaft timing chain tensioner
(RH) shown in the figure to hold the tensioner piston.
removed from. Do not mix the caps.
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:19:27 AM
Page 43
© 2005 Mitchell Repair Information Company, LLC.