Fig. 65: Aligning Timing Marks
Courtesy of MAZDA MOTORS CORP.
14. Loosen the RH bank camshaft cap bolts in several passes in the order shown in the figure and remove the
camshaft cap.
Fig. 66: Identifying RH Camshaft Cap Bolts Removal Sequence
Courtesy of MAZDA MOTORS CORP.
15. Remove the camshaft, camshaft sprocket, camshaft timing chain, and camshaft timing chain tensioner of
the RH bank as a single unit.
CYLINDER HEAD REMOVAL NOTE
1. Loosen the cylinder head bolts in several passes in the order shown.
Fig. 67: Identifying Cylinder Head Bolt Removal Sequence
2007 Mazda CX-9 Grand Touring
2007 ENGINE Mechanical (MZI-3.5) - CX-9
Microsoft
Sunday, November 15, 2009 9:19:27 AM
Page 45
© 2005 Mitchell Repair Information Company, LLC.