A13914AF
9-53
Maintenance
Six-Month Maintenance
9
Figure 9.33
3
Lower electrode tip with the membrane face down into the soaking solution until it floats. For
maximum initial operational stability, the ideal soaking time is 24 hours. The minimum
required time is one hour.
If maximum soaking time is not allowed, the new electrode may require a few hours of
operation to achieve complete electrical stability. During this period of time, more frequent
than normal calibration may be required in response to system error messages. Assay results
are not compromised during this time.
4
After soaking is completed remove the tip from the soaking solution and dry sides using a
lintless tissue. DO NOT touch electrode tip.
5
Remove the back protective cover from the electrode tip. Check for the presence of moisture.
Remove any moisture using lintless tissue. Proceed to
in this section.
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......