A13914AF
9-100
Maintenance
As-Needed/As-Required Maintenance
Install the New Probe
1
Remove the protective sleeve from the probe tip and slip the probe down into the collar wash
block with the threaded end upward.
2
Install a new O-ring in the groove on the tip of the nut. It is OK to reuse an old O-ring if the new
O-ring is lost.
3
Slip the probe up, into the level sense bead fitting being careful not to lose the O-ring.
4
Tighten the probe with a wrench until it makes solid contact and locks within the fitting.
5
Wipe the outside and bottom portion of the probe with 70% isopropyl alcohol. Proceed to
Additional Procedures
Home, prime and align the system to resume proper system operation.
1
Select:
•
Instr Cmd
.
•
1 Home
.
2
Select:
•
Utils
from the menu bar,
•
1 Prime
. Prime the probe that was replaced one time and watch for leaks or drips.
—
If replacing the MC Sample Probe
·
Prime the MC Sample Delivery Subsystem
—
If replacing the CC Sample Probe
·
Prime the CC Sample Delivery Subsystem
—
If replacing the Either CC Reagent Probe
·
Prime the CC Reagent Delivery Subsystem
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......