A13914AF
9-56
Maintenance
Six-Month Maintenance
2
Loosen the flow cell retaining screw (1) located at the top of the flow cell. This is a captive screw
and cannot be removed from the flow cell. Pull assembly forward and upward to remove.
IMPORTANT
Do not disconnect any of the reagent lines attached to the flow cell. Removal of the flow
cell is not necessary for replacing electrodes located on the right side of the flow cell.
Figure 9.37
3
Locate Potassium electrode (1). Remove electrode by loosening the electrode retaining nut.
AND/OR
Locate Calcium electrode (2). Remove electrode by loosening the electrode retaining nut.
Figure 9.38
4
Remove the retainer nut from the old electrode. Remove the quad-ring (1) from the tip of the
old electrode. Inspect the electrode port if the quad-ring is not on the electrode. Discard the
quad-ring.
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......