A13914AF
9-55
Maintenance
Six-Month Maintenance
9
3
Prevent leakage of reagent from the flow cell.
•
Select:
—
Utils
from the menu bar,
—
2 Maintenance
,
—
3 ISE Service
,
—
Continue
.
The flow cell is prepared for electrode maintenance.
4
Refer to the appropriate electrode procedures for servicing other electrodes (
).
•
Chloride Electrode (or
Replace the Chloride Electrode Tip
)
•
CO
2
Measuring Electrode (
•
Sodium Electrode (
Replace the Sodium Measure/Reference Electrode
).
Removal and Installation of the Electrodes
CAUTION
To prevent damage due to electrical static discharge (ESD), wear the wrist ground
strap when you perform this procedure. For further instructions, refer to
in the beginning of this chapter.
1
Disconnect the electrode cable from potassium connector (1) and calcium connector (2).
Figure 9.36
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......